Airport Bunnings
Large-format civil works on Orchard Road.
This major project, involving the earthworks for the new Bunnings Warehouse on Orchard Road, started in early October 2018. The scope of works includes the building earthworks, carpark, pavements, vehicle crossings, and 3-waters including sewer, stormwater, and water.
The full catalogue of Frews' GPS grade control system was employed for this project. The 20t excavator and 12H grader, each equipped with Leica iCON 3D machine control, enabled operators to work to exact levels, save time, and eliminate the risk of over-excavating. A Leica iCON rover unit was also used for set-out and for checking on-site levels against the plans.
With the works taking place on CIAL land, strict compliance was required around health and safety and nuisance dust control. Two Frews operators were recognised as site safety champions, a water cart was kept on site for dust suppression, and erosion, sediment, and debris exiting the site were controlled through daily road sweeping.
Brooklands Fire Station
Foundation raft works with tight site coordination.
Frews successfully tendered for the early works for the construction of the new Brooklands Fire Station, involving the construction of a foundation raft for the new structure. The job required the removal of 1,000m3 of soil, which was then backfilled with 2,000m3 of compacted AP65 and M4 AP40.
For this project, Frews utilised a Leica iCON GPS rover unit to accurately set out the extent of works and measure levels so that excavation and fill levels matched the plans exactly. This also allowed for the accurate monitoring and recording of fill levels.
Part of these works required Frews to coordinate with an archaeologist on site. This was managed to allow the archaeologist to work unimpeded while progress continued in non-hotspot areas. Transport routes were changed to accommodate houses in Kainga affected by truck movements, and self-imposed speed limits were set through residential areas.